Cipher Digital's Q2 2026 revenue fell 43% to $24.8M on cheaper bitcoin, and a $150.5M Google-warrant revaluation pushed the net loss to $267.5M, as the company spent heavily to turn into an AI data-center landlord; first Black Pearl rent started in August.

Revenue
$25M
-43.0% YoY
Net income
-$268M
-484.4% YoY
Diluted EPS
$-0.65
-441.7% YoY
Operating margin
-316.2%

This period vs a year ago

  • Same period last year
  • This period
Revenue-43.0%
≈$44M
$25M

Year-ago figures (≈) are worked out from the growth rate the company reported. Each row has its own scale.

Overview

Cipher Digital (formerly Cipher Mining) is midway through turning itself from a bitcoin miner into a builder and landlord of large data centers for AI computing. Q2 2026 shows both halves of that transition at their awkward worst. The legacy mining business shrank. Revenue fell 43% to $24.8 million because bitcoin was cheaper than a year ago, and the new data centers had not started paying rent yet. Net loss jumped to $267.5 million ($0.65 per share) from $45.8 million. More than half of that loss ($150.5 million) is a non-cash accounting charge: the warrant Cipher gave Google became more valuable as Cipher's share price rose. Beneath the accounting, the quarter was about building. Cipher borrowed another $810 million, spent heavily on construction, and, just after quarter-end, handed its first data-center capacity at the Black Pearl campus to its hyperscale tenant (a very large cloud company), with rent starting in August.

At a glance

  • Revenue of $24.8 million, down 43.0%. Bitcoin mining is now the only revenue line, and management attributes the drop to "lower bitcoin prices," partly offset by mining more coins. This line is set to be overtaken by data-center rent once leases start paying.
  • Net loss of $267.5 million, of which $150.5 million is a warrant revaluation. This charge moves with Cipher's own share price, not with how the business performed. Adjusted EBITDA (a company-defined profit measure before interest, tax, depreciation, stock pay and fair-value swings) was −$30.0 million, versus +$32.3 million a year earlier.
  • $6.0 billion of debt against $831.8 million of unrestricted cash. Another $3.7 billion of cash is restricted to funding specific construction projects and debt-service accounts. The bet now depends on finishing buildings on time and on budget.

The quarter in numbers

MetricQ2 2026Q2 2025YoY Change
Revenue (bitcoin mining)$24.8M$43.6M−43.0%
Cost of revenue (mainly power)$15.0M$15.3M−1.9%
Mining margin before depreciation39.4%64.8%−25.4 pts
Operating loss−$78.5M−$45.2MLoss 74% larger
Operating margin−316.2%−103.9%−212.3 pts
Change in fair value of Google warrant−$150.5M—New item
Net loss−$267.5M−$45.8M−484.4% (loss 5.8x larger)
Loss per share (diluted)−$0.65−$0.12−441.7%
Adjusted EBITDA (company measure)−$30.0M$32.3MSwung to a loss

"Mining margin before depreciation" is revenue minus cost of revenue (almost all electricity), divided by revenue. It shows how much of each mining dollar is left after paying for power. Because Cipher's main mining site, in Odessa, Texas, buys power at a fixed price, the power bill barely moved ($15.0M vs $15.3M). When bitcoin revenue fell, the whole drop came out of margin.

Balance sheet itemJune 30, 2026Dec 31, 2025
Cash and cash equivalents (unrestricted)$831.8M$628.3M
Restricted cash (current + noncurrent)$3,728.0M$2,036.4M
Long-term borrowings, net$5,446.9M$2,711.6M
Property and equipment, net$2,132.6M$633.4M
Bitcoin held646 BTC ($37.8M)1,433 BTC ($125.4M)
Total stockholders' equity$562.1M$805.5M

Takeaway: The headline loss says almost nothing about this business's direction. The $150.5 million warrant charge rises and falls with Cipher's own stock price. What matters is execution: Cipher now carries about $6.0 billion of debt for data centers that only started paying rent in August 2026. Its biggest project, Barber Lake, has since been pushed into Q4 2026–Q1 2027, and Cipher will absorb the first $359.3 million of cost overruns there. From here, results depend on delivering buildings on time, not on mining bitcoin.

What drove the loss

Bitcoin mining shrank. Revenue came entirely from mining at the Odessa facility. For the first half, Cipher mined 798 bitcoin worth $60.1 million at the time it received them, about $75,000 per coin. It sold 1,619 coins for $123.4 million, drawing its bitcoin holdings down from 1,433 to 646. The sales booked a $23.5 million realized loss in Q2 (a realized loss means coins were sold below the value they were recorded at). Partly offsetting that was a $16.9 million unrealized gain on the coins still held, a paper gain from revaluing them at the quarter-end price. Because the two point in opposite directions, they largely cancel. Net, bitcoin price swings cost about $6.6 million this quarter.

People costs nearly tripled. Compensation and benefits rose to $42.4 million from $15.7 million. The 10-Q attributes this "primarily" to stock-based compensation on awards granted this year. Stock pay alone was $30.5 million, versus $10.5 million a year earlier. General and administrative costs rose $7.4 million to $16.5 million, "primarily driven by increased legal fees... related to strategic initiatives" (lease negotiations and financings).

Depreciation fell by more than half, to $19.4 million from $44.1 million. This came from older mining machines being written down in 2025 and sold. It is not an operating improvement: those assets now produce less, or are gone.

The power contract lost value. Cipher's fixed-price Odessa power contract with Luminant is marked to market each quarter. It lost $5.9 million of value as forward power prices fell and its remaining term shortened (about 1.1 years left). Separately, Cipher made $2.3 million selling unused power back to the Texas grid.

Financing costs arrived before rent did. Interest expense jumped to $66.7 million from $1.1 million because of the debt raised to build data centers. Interest income was $35.9 million, earned on the billions of borrowed cash waiting to be spent. Below the operating line, the $150.5 million warrant charge finished the job.

The Google warrant, explained

In September 2025, Google agreed to guarantee Fluidstack's rent at Barber Lake (Fluidstack is Cipher's tenant there). In return, Cipher gave Google the right to buy 24,178,576 Cipher shares for $0.01 each. Accounting rules treat that promise as a liability that is revalued every quarter. When Cipher's stock rises, the liability grows and Cipher books a loss; when the stock falls, it books a gain. In Q2 the stock was strong (Cipher sold new shares through its at-the-market program at an average net $23.50), so the liability rose to $632.1 million and produced the $150.5 million charge. In Q1 the same line produced a $43.6 million gain (the half-year net is a $106.9 million loss).

The agreement has a floor. If the warrant shares are worth less than $430.0 million on the day before Google can start exercising, Cipher must issue extra shares or pay cash to make up the shortfall. Exercise begins when the Barber Lake lease commences. The stock closed at $11.34 on October 13, 2026 (as stated in Cipher's own October 14 filing). At that price the 24.18 million warrant shares would be worth roughly $274 million, about $156 million short of the floor. Expect a large warrant gain in Q3 as the stock fell. The floor means part of that "gain" may later come back as extra dilution or a cash payment.

What the headline numbers hide

  • Cash conversion: the operating cash line needs adjusting both ways. First-half operating cash outflow was $152.0 million against a $381.8 million net loss. The gap is mostly non-cash items: $125.9 million of debt-discount amortization, the $106.9 million warrant loss and $57.6 million of stock pay. But Cipher counts bitcoin it mines as a non-cash item, and records the $123.4 million it got from selling bitcoin under investing, not operating. Netting the two, the business consumed about $28.6 million of cash in the half before construction spending.
  • Construction spending dwarfs everything else. Cipher paid $964.3 million for property and equipment in the half. Another $542.7 million of equipment purchases was sitting unpaid in payables and accruals at June 30. Accounts payable rose to $289.1 million from $40.1 million. A further $23.2 million of interest was capitalized, meaning it was added to the cost of buildings under construction instead of going through the income statement.
  • Much of the interest line is non-cash. For the half, the $125.9 million of interest expense equals the $125.9 million of debt-discount and issuance-cost amortization shown in the cash flow statement. Much of that is accounting accretion on the 0% 2031 convertible notes, carried at a $398.5 million discount to their $1.3 billion face value. The secured notes carry real coupons of 6.0%–7.125% on $4.5 billion of principal, and those coupons will be paid in cash.
  • Adjusted EBITDA excludes real costs. The company measure adds back $30.5 million of stock pay, the $150.5 million warrant charge and the $5.9 million power-contract loss. It still came in at −$30.0 million. It keeps the bitcoin realized and unrealized swings in, so it is not a clean "mining profit" figure either.
  • Shareholders are being diluted on two fronts. Shares outstanding rose to 414.3 million from 405.0 million at year-end. In Q2, 5.5 million shares were sold for $129.2 million, and 5.5 million more were delivered on vested stock awards. Cipher spent $49.0 million in the half buying back shares to cover employees' withholding taxes. Stockholders' equity fell to $562.1 million from $805.5 million, which leaves only a thin equity cushion under $6.9 billion of total liabilities.
  • One-offs. The first half included a $7.4 million write-down of miners held for sale (Q1) and a $24.3 million fair-value loss on investments. The investment the 10-Q describes is about 806 million Canaan Inc. shares, received in February in exchange for Cipher's stakes in three mining joint ventures and some Black Pearl mining rigs. Neither will repeat in the same form.

What happened after the quarter

  • Black Pearl started paying. Cipher amended its Black Pearl lease at the tenant's request and began delivering capacity at the start of August, two months early, with rent commenced. Black Pearl is a 15-year lease for about 300 gross MW with an investment-grade hyperscaler. Q3 should therefore show Cipher's first data-center lease revenue.
  • Barber Lake was delayed, and got longer. On September 25, Cipher amended the Fluidstack lease. The 10-Q had said Cipher expected to deliver the facility in September 2026. Data halls will now be handed over in phases from Q4 2026 through Q1 2027, with first rent in Q4 2026. A "leading AI lab" committed to a further 10-year lease after Fluidstack's term ends, which Cipher says adds about $5.2 billion of contracted revenue (over $9 billion in total at the site). Under the new cost-sharing terms, Cipher bears the first $359.3 million of costs above the original budget, and the tenant reimburses 50% of overruns beyond that over 20 years.
  • More borrowing. On October 14, Cipher priced $850.0 million of 0% convertible notes due 2032 (plus a $150.0 million option for the buyers). The conversion price is about $15.31, a 35% premium to the $11.34 share price, and part of the 2030 convertibles is being exchanged at the same time.
  • Pipeline. In July, Cipher took an option on "Apollo," a site for up to 900 MW near San Antonio. The 10-Q describes 700 MW under development across three leased sites, 207 MW of operating bitcoin mining at Odessa, and a further 4.4 GW pipeline.

Outlook

Management gave no revenue or earnings guidance. Its stated near-term goals are completing Barber Lake and Black Pearl and keeping the third leased campus, Stingray, "on schedule"; the June $810.0 million notes "fully funded" Stingray through substantial completion. Its credit facility requires minimum liquidity of $100 million, rising to $150 million and then $200 million as each of Barber Lake and Black Pearl starts operating.

Our read: Q3 2026 (due in early November) should look very different on paper. Expect the first Black Pearl rent, a likely warrant gain given the stock's fall, and continued mining weakness. None of those will settle the real question. That question is whether Barber Lake's phased hand-over stays on its revised Q4 2026–Q1 2027 timetable, and how much of the $359.3 million overrun allowance Cipher actually uses. Barber Lake has already slipped once from its September target. The new 2032 convertibles add roughly $850 million more debt on top of $6.0 billion. That leaves little room for a second delay before interest costs outrun the rent ramp. Things to watch in the Q3 filing: the first quarterly lease revenue figure, the remaining construction spend on Barber Lake, and whether the warrant liability falls toward the $430 million floor.