NEE — Q3 2026 Financial Report Analysis

Q3 · Fiscal year 2026 · Published by Pham Hop

NextEra Energy's Q3 2026 GAAP profit nearly doubled to $4.78 billion on a $2.2 billion after-tax hedge gain; adjusted EPS rose 9.7% to $1.24 on FPL rate-base growth and new NEER projects, with the backlog at ~36.7 GW.

At a glance

  • Adjusted EPS $1.24, up 9.7%: the number management steers by grew at roughly the pace of its 8%+ long-term target, with no help from hedges.
  • $2,246 million after-tax hedge gain: this one non-cash item explains about 94% of the $2,337 million rise in GAAP profit, which is why the 96% headline should not be extrapolated.
  • NEER backlog ~36.7 GW: 3.7 GW of new renewables and storage contracts signed in the quarter (2.4 GW of it batteries), up from ~35.1 GW three months ago even after 1.8 GW entered service.
Revenue
$8.1B
+1.6% YoY
Net income
$4.8B
+95.9% YoY
Diluted EPS
$2.28
+93.2% YoY
Operating margin
32.4%

This period vs a year ago

  • Same period last year
  • This period
Revenue+1.6%
≈$8.0B
$8.1B
Net income+95.9%
≈$2.4B
$4.8B
Diluted EPS+93.2%
≈$1.18
$2.28

Year-ago figures (≈) are worked out from the growth rate the company reported. Each row has its own scale.

How NEE compares with Utilities peers

  • NEE
  • Peer median
  • Each peer (hover for name)
Revenue growth (YoY)+1.6% · median +3.4% · 16th of 26
≤ -5.4%≥ +16.5%
Operating margin32.4% · median 21.0% · 2nd of 26
≤ 9.0%≥ 32.4%
EPS growth (YoY)+93.2% · median +19.7% · 1st of 25
≤ -58.9%+93.2%

Rank 1 = fastest revenue growth, highest operating margin, fastest EPS growth. Peers are the other Utilities companies with a 2026 report on this site, each at its latest period we've analyzed; fiscal calendars differ, so periods are not always the same months.

NextEra Energy's reported profit almost doubled in the third quarter of 2026, but nearly all of that jump is a paper gain on financial hedges, not extra electricity sold. GAAP net income attributable to NextEra (the official accounting profit) rose 96% to $4,775 million, or $2.28 per diluted share, from $2,438 million and $1.18 a year earlier. Adjusted earnings, management's own measure that strips out those hedge swings and a few other items, rose 10.4% to $2,592 million, and adjusted earnings per share rose 9.7% to $1.24 from $1.13. The underlying growth came from the same two places as last quarter: Florida Power & Light (FPL) earning a return on a larger asset base, and NextEra Energy Resources (NEER) bringing new wind, solar and battery projects into service.

This analysis is written from the earnings release NextEra filed on October 21, 2026 (Form 8-K, Exhibit 99). The full Q3 10-Q has not been filed yet, so the management discussion that normally explains each line-item movement is not available; where the release does not say why something moved, we say so rather than guess.

Q3 2026 by the numbers

MetricQ3 2026Q3 2025YoY Change
Operating revenues$8,090M$7,966M+1.6%
Operating income$2,624M$2,527M+3.8%
Operating margin32.4%31.7%+0.7 pp
Net income attributable to NEE (GAAP)$4,775M$2,438M+95.9%
Diluted EPS (GAAP)$2.28$1.18+93.2%
Adjusted earnings (non-GAAP)$2,592M$2,348M+10.4%
Adjusted EPS (non-GAAP)$1.24$1.13+9.7%
FPL net income$1,620M$1,463M+10.7%
NEER adjusted earnings$1,247M$1,102M+13.2%
FPL regulatory capital employed growth~+9.2%——
NEER renewables & storage added to backlog3.7 GW——
NEER total backlog~36.7 GW——

Operating margin is operating income divided by revenue: the share of each sales dollar left after running the business, before interest and tax. The release does not give the year-ago quarter's origination or backlog, so those cells are blank rather than estimated.

Where the growth came from

FPL: steady rate-base growth. FPL is NextEra's regulated Florida utility. Its profit is set largely by how much capital it has invested on customers' behalf (its "regulatory capital employed", the base on which regulators allow it to earn a return), so its earnings tend to track that base. Capital employed grew about 9.2% and FPL's net income grew 10.7% to $1,620 million ($0.77 a share versus $0.71). The release attributes the growth "primarily" to "continued disciplined capital investments"; its EPS bridge puts new investment growth at +$0.05 a share and other items at +$0.01. FPL spent about $2.4 billion on capital projects in the quarter and expects about $12 billion for the full year.

Two FPL line items moved a lot and partly cancelled each other. Depreciation and amortization fell from $1,385 million to $875 million, while income tax expense rose from $52 million to $329 million. That is why FPL's operating income jumped 24% ($2,235 million versus $1,797 million) but its net income rose only 10.7%. The release does not explain the depreciation drop. FPL's rate agreements have historically allowed it to vary a non-cash "reserve amortization" within depreciation to keep its return inside an allowed band, which would produce this kind of swing, but the 10-Q is where that will be confirmed. Readers should not take FPL's 24% operating-income growth at face value.

FPL revenue rose 2.6% to $5,421 million. Part of that is fuel: fuel and purchased-power cost rose from $1,124 million to $1,277 million, and fuel is passed through to customers at cost, so it adds revenue without adding profit.

NEER: new projects carry the growth. NextEra Energy Resources builds and runs wind, solar, battery, nuclear and gas assets, mostly selling power under long-term contracts. Its adjusted earnings rose 13.2% to $1,247 million ($0.59 a share versus $0.53). The bridge in the release breaks down the GAAP change per share:

NEER driver (per share)Q3 2026 vs Q3 2025
New investments+$0.09
Existing energy assets+$0.05
Customer supply−$0.04
Non-qualifying hedges+$0.07
Nuclear decommissioning fund securities−$0.04
Other (financing, G&A, asset recycling, taxes)−$0.04

"New investments" are projects in their first year of operation. "Customer supply" is NEER's gas, oil and wholesale energy-services business, which has now been a drag in each of the three quarters of 2026 (−$0.11 a share year to date).

NEER's reported revenue actually fell 1.9% to $2,516 million and its operating income fell from $801 million to $455 million, as fuel cost rose ($422 million versus $299 million), depreciation rose with the larger fleet ($761 million versus $695 million) and gains on asset sales were smaller ($46 million versus $142 million). Its bottom line still rose because of a positive $49 million interest line (versus a $405 million expense a year ago, again hedge-driven), higher earnings from joint ventures ($293 million versus $195 million), a $248 million tax benefit and a $408 million loss assigned to minority partners. Those partners are largely tax-equity investors who take tax credits and early-year losses in exchange for funding projects, so NEER's profit relies heavily on how clean-energy tax credits are shared out. That is normal for this business, but it means NEER's operating line says little about its earnings.

Backlog, capacity and large-load deals

The industry-specific number for NEER is its backlog: signed contracts for projects not yet in service, the nearest thing it has to an order book.

  • Origination: 3.7 GW of renewables and storage added in the quarter, of which 2.4 GW was battery storage (Q2: 3.6 GW, of which 2 GW storage).
  • Backlog: about 36.7 GW after 1.8 GW of projects were placed in service since the late-July call, up from about 35.1 GW at Q2.
  • Transmission and pipelines: regulated and invested capital plus secured capex in electric and gas transmission is about $12.7 billion, up roughly 25% since December 2025. NEER formed a joint venture with Chesapeake Utilities to build a $1.2 billion, 97-mile gas pipeline in South Florida.
  • Large-load (data-center-type) projects: definitive agreements for three "federal hub" projects (two in Texas, one in Pennsylvania) totalling about 16.5 GW, with $5.7 billion of initial funding secured year to date. For these NEER expects to develop, build and operate for fees without investing its own capital, so the 16.5 GW should not be read as future rate base. Separately, at the Department of Energy's Paducah site in Kentucky, NextEra expects to own up to 2 GW of gas generation and up to 2.6 GW of batteries. It says it is discussing 30 potential hubs and expects 40 by year-end.
  • Nuclear: the Duane Arnold restart in Iowa is on track for no later than Q1 2029, now backed by a DOE loan of up to $1.9 billion closed in the quarter. A 20-year contract for about 1 GW of Point Beach (Wisconsin) output was signed, still subject to state approval, which leaves the plant's full output contracted into the 2050s.

What the headline numbers hide

  • The GAAP jump is a hedge valuation, mostly at the parent. NextEra holds derivatives (largely interest-rate hedges, judging by where they show up) that do not qualify for hedge accounting, so changes in their market value hit profit straight away. This quarter they produced a $3,005 million pre-tax gain ($2,246 million after tax), $2,623 million of it in Corporate and Other, against a $52 million after-tax gain a year earlier. That is why consolidated "interest expense" shows as a positive $1,929 million instead of last year's $1,153 million cost. Actual borrowing grew: total debt rose from about $95.6 billion at December 31, 2025 to about $113.9 billion at September 30. The value of these hedges moves with interest rates and can reverse; in the first nine months of 2025 the same line cost $649 million after tax.
  • Excluded items, in full: hedge gains, nuclear decommissioning fund securities ($38 million after-tax loss this quarter), XPLR Infrastructure investment effects ($6 million) and Dominion merger costs ($19 million pre-tax). Merger costs are new this year ($51 million year to date) and are small next to the hedge line.
  • Adjusted EPS grew a little slower than adjusted earnings (9.7% vs 10.4%) because the diluted share count rose 1.3% to 2,098 million from 2,071 million. NextEra is issuing equity, not buying back stock, so there is no buyback lift to strip out.
  • Corporate and Other is a growing drag on an adjusted basis: an adjusted loss of $275 million versus $217 million, which the release's bridge groups under "other, including interest expense and share dilution". That is the cost of funding the build-out.
  • Cash conversion is strong. Nine-month operating cash flow was $12,322 million, up 23% from $9,986 million, above both GAAP net income of $8,677 million (which includes $3,594 million of non-cash derivative gains that the cash-flow statement removes) and adjusted earnings of $7,274 million.
  • But the build-out is debt-funded. Nine-month capital spending was $8,160 million at FPL (+21%) and $19,044 million of independent power and other investment at NEER (+55% from $12,276 million), more than double operating cash flow. The gap was filled with $18,232 million of new long-term debt, $5,411 million of net short-term borrowing and commercial paper, $1,559 million from selling minority stakes in projects and $969 million of equity units.
  • Low tax rate. The consolidated tax charge was $89 million on $8,766 million of nine-month pre-tax income (about 1%), reflecting NEER's tax-credit-heavy portfolio. Earnings quality here depends on federal clean-energy credit rules staying as assumed in guidance.
  • Receivables and inventory rose 20% and 17% since December, but that compares a September balance with a December one; Florida's summer billing season makes this comparison seasonal, and the release gives no September 2025 balance to compare like with like.

Year to date

For the first nine months, revenue was $22,325 million (+6.8% from $20,912 million). GAAP net income attributable to NextEra was $10,102 million versus $5,300 million (+91%), inflated by the hedge gains this year and by a $650 million after-tax XPLR Infrastructure loss and $649 million after-tax hedge loss in 2025. Adjusted earnings were $7,274 million (+11.1%) and adjusted EPS $3.47 (+9.5% from $3.17).

Did last time's read hold up?

Our Q2 2026 analysis said guidance at the high end looked achievable and flagged three things to watch: hedge gains that could reverse, an operational growth story riding entirely on new projects because NEER's existing fleet (−$27 million) and customer supply (−$70 million) were both negative, and tax-credit dependence. Partly held. The high-end target was reiterated and adjusted EPS growth stayed near 10%. The existing fleet turned positive (+$0.05 a share), so growth was less one-legged than in Q2. Customer supply stayed negative (−$0.04). The hedges did not reverse; the gain grew, so GAAP is even further from adjusted than before. Backlog rose from ~35.1 GW to ~36.7 GW as expected.

Takeaway: Ignore the 96% GAAP profit jump: $2.2 billion of it is a mark-to-market gain on hedges. The real quarter is adjusted EPS up 9.7%, built on FPL's ~9% rate-base growth and new NEER projects, and nine-month adjusted EPS of $3.47 means management only needs about $0.55 in Q4, roughly what it earned in Q4 2025, to hit the top of its range. The risk is not this year's number. It is the roughly $18 billion of extra debt taken on since December to fund the build-out, and a GAAP line that can swing billions either way.

Outlook

Management reaffirmed 2026 adjusted EPS of $3.92–$4.02 and says it is targeting the high end. It also kept its 8%+ compound annual adjusted EPS growth target through 2032, extended to 2035, off the 2025 base of $3.71; dividend growth of roughly 10% a year through 2026 (off a 2024 base) and 6% a year from year-end 2026 through 2028. The combined company with Dominion Energy is projected to support about 11% annual regulatory capital growth and 9%+ adjusted EPS growth through 2032. Shareholders of both companies approved the deal on September 3; Virginia and South Carolina hearings are set for November and December with final orders expected in January 2027, North Carolina hearings begin in February 2027, and closing is expected in the second half of 2027.

Our read: the 2026 target is very likely met. Subtracting nine-month adjusted EPS ($3.47) from the 2025 base ($3.71) implies Q4 2025 adjusted EPS of about $0.54, so the $4.02 top end needs Q4 2026 growth of only about 2%, against 9.7% this quarter. The two things to watch in Q4 are Hurricane Isaias, which hit Northwest Florida on October 10 after the quarter closed (Florida utilities usually recover storm-restoration costs through customer surcharges, and the release's cash flow shows a "recoverable storm-related costs" line, but no Isaias cost estimate is given yet), and whether customer supply keeps dragging on NEER. Longer term, the question is funding: capex and investment are running more than twice operating cash flow, which is what the Dominion deal's larger regulated base and the fee-based federal hub model are partly meant to ease. The upcoming 10-Q should explain the FPL depreciation drop and NEER's revenue decline, the two line items this release leaves unexplained.